April 2012

Picture & video Blog
 
 

This project consisted of removal of an old deck and the rebuilding of a new stronger deck.

To connect the two decks we began building the first set of stairs.

After the first set of stairs was complete we then poured the concrete pad for the ground level stairs.

The next morning, when the concrete was hard, we were able to start fabricating the ground level stairs.

At this point in the project we finished installing the decking boards on both levels of the deck.

With the decking complete, the final step was to build the rails and install balusters. The balusters are pre-drilled and screws are used to prevent splitting in the future.

And the final product!